Technical Specifications

Technical Specifications for Prefabricated Structure

Technical Specifications

Super solutions


Size Any sizes as required (Owner's Choice)
Shape & Design Any design & shape desired (Owner's choice)
Interior/Applications ULTRA Modren(most suitable for study room,conference halls,high class offices, bed rooms, guest rooms, Air conditioned bunk houises, cottage & containers)
Main Frame Hollow steal pipe framing 58 * 58 mm(14G) (Detachable) & bracing with 38 * 38mm(18G). The Main fabrication of the structural framework shall be integral (Welded) to comprise of the bottom frame, overall framework, internal, external cladding with insulation and other peripherals, sloping self-draining roof and desired door, window, AC openings etc. The main corner vertical supported shall be made with M. S. Square pipe section. All the corner post to be suitably welded. The corner post to be housing the MS corner block / lifting hooks.
Outer cladding 10 mm thick silica Fiber Board covered with epoxy & P.U. Texture & Silicon coating.
Insulation/Acoustic 25mm thick Glass/mineral Wool/PUF (if desired i.e. optional at additional cost.)
Temperature can withstand-20°C to +70°C very easily.
Inner Cladding Leminated (both side) with 8mm thick midium density fiber boardwalls/5mm thick both sidereinforced bakalite lining (in natural wood finish & plane shade as desired.)
roofing G.I. sheet profile in Sloping/Hut/Plane shape (insulated) with 8 feet height inside.
False Ceiling Combination of OrnamentalTeak Finish/LeminatedFiber Board falseceiling with insulation, Ornamental cornice on top and concealed lacquer coated brass spotlights.
Doors/Windows One main door of size 2100x 900 mm to be provided with proper hardware items like hinges, lock and handles, Rolling shutter for electrical room and 2no’s of 3’x3’ windows to be provided as per the Requirement/drawing. Canopies to be provided for all windows and doors
Location of Doors/Windows Wherever desired (as per choice of owner.)
Dismatling & Reassembling very easy & very nominal rates. the components can be easilytransported to any difficult terrain and errected/dismantled very fast with ordinary toolsrequiring no high skills.
Lighting Concealed brass fittings with anchor swiches and sockets, concealed copper wiring (wherever desired by owner) in ratio of one point per 50sq.ft.(Fan,Cooler,A.C. to be suppliedby the owner, if desired)
Flooring C.C. platform to provideed by owner at side wherever required or if required with 16mm thicksilica fiber board over steel frame with flanges at additional cost.
Kitchen $ Toilets Luxurious Ceramic Tiles in floors and leminated Acrylic Bakelite Wall lining uin bathroom if required shade & with white(colour optional) toilet fixturesincluding concealed G.I. and Hard plast PVC sewerage pipelining.(internal)
Painting P.U. Texture coating on outer wall of desired shadewith classic texture finish covered with silican coating.The external steel surface shell be pre-treated with anticorrosive steel guard chemical. Outer: one coat of red oxide primer and two coats of epoxy final Paint of customer approved color to be applied. Under structure: one coat red oxide primer and one black paint.
Base Fixed/Flanged
Ground Clearance 6" or as desired.
Outer Cladding – Wall Exterior Cladding shall be of 16g/ 1.6 mm thick C.R Sheets duly corrugated of standard size. This corrugation version acts as stiffeners and increase strength to weight ratio & eliminates the use of any other vertical supports. Outer cladding sheet shall be MIG (CO2) welded to the external superstructure. All gaps are sealed to avoid any water leakage, ingress of insects, moisture, Two side walls of the office to be of glass panels etc..
Outer Cladding – Wall Exterior Cladding shall be of 16g/ 1.6 mm thick C.R Sheets duly corrugated of standard size. This corrugation version acts as stiffeners and increase strength to weight ratio & eliminates the use of any other vertical supports. Outer cladding sheet shall be MIG (CO2) welded to the external superstructure. All gaps are sealed to avoid any water leakage, ingress of insects, moisture, Two side walls of the office to be of glass panels etc..